Every liner shows
- Meterage reading
- Batch number
- Order number
A customer can identify
- Manufacturing date of the liner
- Installer of the liner
- The engineer responsible for the contract
Standards Followed:
- WRc (Water Research Council Manual)
- ASTM F1216,
- WIS 4-34-04 for CIPP